|
|||||||
| BACKCOUNTRY RIDES - BUILD THREADS We all like to see builds from the crate up. Bring us along for the creation. |
![]() |
|
|
Thread Tools | Display Modes |
|
#1
|
|||
|
|||
|
Bought a yamaha vector this summer that had a custom front mount turbo system. Was going to make only a little change and it turned into pretty much a completely different custom turbo kit. Incorporating some of the different things I like from different turbo kits.
Hope to have it together by the 1st of dec. Will be running pump gas with a meth injection kit. Sled already has a huge drop and roll as well as a 162 2.5 track. I have some ideas as well for making the stock suspension better for climbing that I will be trying. Figured I would share some pictures of it. The way it looked when I got it. ![]() ![]() Tore down and cleaned ![]() Cut out the tunnel and bulkhead ![]() Closed it back up ![]() Motor back in
|
|
#2
|
|||
|
|||
|
Rider Forward
![]() Rev tank ![]() ![]() Turbo Ready to be employed, and 3 inch tubing for downpipe ![]() Intercooler intake end tank and carb flanges ready to be welded ![]() Machining new header flange
|
|
#3
|
|||
|
|||
|
Header flange bolted up.
I hope to have some pictures of the header and the intercooler welded up by the end of the week.
|
|
#4
|
|||
|
|||
|
looking good
|
|
#5
|
|||
|
|||
|
Couple more things done, Trimmed the foam in the yamaha boss seat to fit over rev tank. And looks great little scary trimming a $400 seat. Also rev tank has all the mounts done. Things will start to come together very quickly now.
Here are few pictures. ![]() Header All tacked up ready to be welded. ![]() Header in place, to get down pipe done.
|
|
#6
|
|||
|
|||
|
get that bad boy done
|
![]() |
|
|
| Thread Tools | |
| Display Modes | |
|
|